Wednesday, September 19, 2007

The roof drain repair work on the exterior of the Orient Building (referenced in the Sept. 6th post) is now complete. Interior painting and restoration will be scheduled as classes allow.

Monday, September 17, 2007

The automatic door on the quad side of the Shinnecock Building has been returned to service.
The folding partition wall that divides P100 from the larger cafeteria is currently not functional. This equipment may need to be replaced. A design and funding plan for that replacement is being formulated. The wall is currently in the open position. Please contact Campus Activities if you are considering an event in P100.
The exterior automatic door on the quad side of the Shinnecock building is not functioning. It is currently in the open position. A service call has been dispatched. It is anticipated that this door will be repaired today (Mon. 9/17)